United Kingdom · guide · 18 September 2026

Outline vs full vs reserved-matters planning permission: how conditions apply to each

Informational only. Not planning advice. Not advocacy. The council's sealed decision notice remains the legal document.

Developers phasing sites often hold an outline permission, later submit reserved matters, or receive a single full permission. Each type prints different condition sets and timing triggers on the decision notice. This page is reading literacy — not how to maximise outline permission or write reserved-matters submissions.

Three permission types — reading labels on the notice

TypeWhat the notice usually grantsTypical condition focus
OutlinePrinciple of development; some matters reservedScale/access/appearance reserved; time limit to submit RM; phasing constraints
Reserved matters (RM)Approval of details reserved at outline stageDischarge of outline pre-comm conditions; RM-specific details; may reference outline conditions still in force
FullAll details approved in one grantPre-commencement, during works, pre-occupation, and compliance-only conditions on one schedule

See decision notice vs officer report — the sealed notice binds, not the committee report summary.

Outline permission conditions — what to read first

DecisionBrief classifies timing labels on the notice you paste — see how to read condition timing.

Reserved-matters approval — relationship to outline

When RM is approved, read:

  1. Which outline conditions remain operative (unless discharged).
  2. Which new conditions attach only to the RM approval.
  3. Whether pre-commencement gates now bite for site start — see pre-commencement vs pre-occupation.

Full permission — single-notice reading

Full permissions typically list all detail conditions on one numbered schedule. Use which conditions need discharge to separate discharge gateways from compliance-only duties.

Worked reading habit (illustrative)

Outline for “up to 50 dwellings” — conditions 1–3 may reserve appearance and landscaping; condition 4 may limit commencement until RM for phase 1 is approved.

Full permission for “8 flats” — conditions 1–12 may include pre-comm drainage, approved plans, and a three-year commencement limit on one notice.

Your sealed notice wording governs — these are pattern examples only.

FAQ

Will DecisionBrief advise which permission type to apply for?

No. We read the named sealed notice you order for £79. Application strategy is out of scope.

Does this guide cover S106 obligations?

S106 wording on the same notice is a separate reading task — see S106 vs conditions.

Order a £79 sourced reading See the York sample